3 Commits
Author SHA1 Message Date
waoziandCommandCodeBot b82a57df11 Run the ten one-line check launchers from the check plan
Build check / check (push) Canceled after 0s
Build check / Publish a new Ziran version (push) Canceled after 0s
The launchers only started one Ziran check program, so each becomes a
`check_programs` row that takes the compiler path the same way: `gzip` keeps
its `zi2c` argument (a new `compiler` field) and `executable_bundle` keeps the
`LDLIBS` library and `cmd` module path. `constant_time` and `queue` shared the
check-bundle-run shape, so `spec_selftest` bundles both source and saved
checked IR for each and compares the printed result, which is stricter than the
scripts it replaces. The suite is 263 checks, down from 273.

Also records the owner's queue decisions in plans/open-work.md: check control,
`ziran serve` after the cache, metaprogramming last, and the three dropped
items.

Co-authored-by: CommandCodeBot <[email protected]>
2026-11-23 05:32:46 -03:00
waozi 036cb7b5d2 Stream executable asset identities through the shared SHA-256 runtime 2026-11-18 17:55:53 -03:00
waozi bb89cbe24b Add the revision-28 executable ZX container and machine IR boundary
The experimental direct backend now writes and reads an opt-in
revision-28 ZX container that holds verified lowered instructions.
Stripped files run through the portable engine without source or
semantic IR. Bounded validation covers framing, identities, symbols
and reachability, and versions 26/27 are rejected with a rebuild
diagnostic. Default ziran/zi2zx output is unchanged.

Address-taken local scalars lower to fresh checked frame storage in
the portable engine and native x86-64, including aliases across calls
and recursion and stale-token traps. A verified target-neutral machine
IR keeps Allocate as an explicit effectful operation ahead of register
allocation.

ASSEMBLY/milestones.md reviews the ten-step plan and reorders delivery
around a Linux x86-64 vertical slice. It starts with an Alpha
physical-host baseline and adds staged interim comparisons. Plan
statuses now match the implementation.
2026-11-12 19:11:59 -03:00